EV Charge San Diego (619) 202-8501 Get a free quote

How to permit a home EV charger in San Diego

Inside city limits, a home EV charger is a Simple Permit: applied for online, with no plans submitted for review, and one inspection. Historic homes and multifamily buildings are the exceptions.

Every neighborhood inside city limits, including La Jolla, Pacific Beach, Point Loma, Clairemont, North Park, Rancho Bernardo and Carmel Valley.

Checked against the office's own website on October 12, 2026.

San Diego at a glance

Permit office
City of San Diego Development Services Department
How to apply
Online, as a Simple No Plan permit
What a house submits
None for a single-family home, duplex or townhouse
Inspection
$264.25 per charger; someone opens the panel for the inspector
Fee
$264.25 inspection per charger (May 2026)

Step by step in San Diego

  1. Check it qualifies

    Chargers for a single-family home, duplex or townhouse qualify for Simple Permits. A designated historic resource or a home in a historic district doesn't, and needs the regular permit route with plans.

  2. Fill in the circuit card

    For a private garage, the load calculation goes on the city's circuit card, which stays on site for the inspector.

  3. Apply online and pay

    Apply through the city's online portal as a Simple No Plan permit. Information Bulletin 187 lists the inspection fee at $264.25 per charger, with no plan check fee.

  4. Install the charger

    Keep the charger maker's installation instructions on site.

  5. Pass the inspection

    Give access to all the equipment, including the panel feeding the charger. Inspectors aren't allowed to open energized equipment, so someone responsible has to be there to open it.

What can change the process in San Diego

Condos and apartments

Anything other than a single-family home, duplex or townhouse needs plans before the permit: a site or floor plan, accessibility plans and electrical plans signed by an electrical engineer or a C-10 contractor. The plan check fee is $353.13 per charger.

Doing it yourself

An owner doing the work files the city's owner-builder form, DS-3042.

Let us handle the permit

Our C-10 licensed, in-house team files the permit, books the inspection and meets the inspector, and the permit is part of the fixed price. Read about EV charger installation in San Diego.

Get a free quote

Sources: City of San Diego Information Bulletin 187. Rules and fees change; the office's own pages have the final word.

Ready to charge at home?

Send a photo of your panel and where the car parks. We quote a fixed price and carry out the installation ourselves.

Get a free quote

Prefer to talk? Call (619) 202-8501.

Get quote