EV Charge San Diego (619) 202-8501 Get a free quote

How to permit a home EV charger in Solana Beach

Solana Beach handles a Level 2 charger as an electrical permit applied for by email. The site plan has to be stamped or signed by a C-10 electrical contractor or a California electrical engineer.

Checked against the office's own website on October 12, 2026.

Solana Beach at a glance

Permit office
City of Solana Beach Building Services
How to apply
By email to Counter@cosb.org
What a house submits
Site plan signed by a C-10 or engineer, load worksheet and specs
Inspection
Required; scheduling not published online

Step by step in Solana Beach

  1. Gather the charger documents

    The maker's specifications and installation guidelines, and the city's Electrical Load Calculation Worksheet.

  2. Draw the site plan

    Show the address, parcel number, owner contact, scope of work, the structures, the route from panel to charger, panel amperage and breaker, conduit type, and the charger type and mounting. It must be stamped or signed by a C-10 contractor or electrical engineer.

  3. Email the application

    Complete the permit application and email it with the documents to Counter@cosb.org.

  4. Pass the inspection

    Level 2 installations are inspected. The city doesn't publish how to book online, so ask the counter when the permit is issued.

Let us handle the permit

Our C-10 licensed, in-house team files the permit, books the inspection and meets the inspector, and the permit is part of the fixed price. Read about EV charger installation in Solana Beach.

Get a free quote

Sources: City of Solana Beach EV charger permits. Rules and fees change; the office's own pages have the final word.

Ready to charge at home?

Send a photo of your panel and where the car parks. We quote a fixed price and carry out the installation ourselves.

Get a free quote

Prefer to talk? Call (619) 202-8501.

Get quote